FAQ’s and Forms 

Grading And Excavation:

Clean all loose material and debris from surface.

Re-grade existing base and remove any rocks, grass or unsuitable base material within 6” of surface.

Remove/reclaim existing asphalt from driveway, parking lot or roadway and haul away.

Cut/Remove portion(s) of asphalt from driveway, parking lot or roadway and haul away.

Remove excess stone from driveway, parking lot or roadway and haul away.

Remove grass and topsoil from proposed area to widen drivewaay

Base Installation:

Grade Extra in 2″ – 4” of base material and compact.

Fine Grade 1” – 2” of base material and compact.

Fill holes, low areas and/or travel tracks with a layer of class two asphalt.

Apply SS-1 Tack Coat Emulsion to existing asphalt.

Apply SS-1 Tack Coat Emulsion to existing asphalt where it is to be flush with remaining walks and roads.

Surface Installation:

Install 3” of asphalt and compact with an 8 ton roller.

Install 2” of asphalt compacted with an 8 ton roller.

Install 1 & 1/2″ of binder asphalt compacted with an 8 ton roller.

Install 1 & 1/2″ of surface asphalt compacted with an 8 ton roller.

Install _____________inches of _______________and grade.

Apply 1 coat of MC3000LE oil and 3/8 Native stone and compact.

Curbing:

Install _________ feet of 8” commercial machine asphalt Curb.

Install _________ feet of 4” hand formed asphalt curb

Install feet of Belgian block in a 6” concrete footing without cemented joints.

Reset feet of Jumbo Belgian block in a 6″ concrete footing without cemented joints.

Install square feet of Belgian block apron in concrete footing with cemented